Council Tracker
Every planning authority's local plan, its age and stage, its Housing Delivery Test result, and how its applications and appeals are decided, read each week from public data. Updated 17 October 2026.
Plan details come from what councils send the national planning data platform, and some are missing or late. Applications, appeals and HDT results are checked against official statistics weekly. Known gaps
Map
Hover over or tap an authority to see its record.
- Under 5 years old 75
- 5 to 10 years old 106
- Over 10 years old 92
- No adopted plan on record 6
- Adopted, date not recorded 24
- Former districts' plans 7
- Getting started 59
- Early consultation 70
- Proposed plan 15
- Submitted 24
- At examination 24
- Inspector's report 3
- None recorded 115
- 95% or more delivered 149
- 85 to 94% delivered 34
- 75 to 84% delivered 19
- Below 75% delivered 92
- Measured by former district 2
- Not measured 1
- No result 13
- 95% or more granted 36
- 90 to 94% granted 93
- 85 to 89% granted 94
- 80 to 84% granted 56
- Under 80% granted 31
- Under 20% allowed 10
- 20 to 29% allowed 105
- 30 to 39% allowed 156
- 40% or more allowed 33
- Fewer than 10 decided 6
Not on the map, as the boundaries file has no outline for them: Hartlepool Development Corporation, Middlesbrough Development Corporation. They are in the table.
Every authority
All 310 of England's planning authorities: 296 councils, 9 national park authorities, the Broads Authority and 4 development corporations. Sort by any column. Plan age is from the date of adoption; the stage is that of the most advanced plan in preparation. Applications are those decided July 2025 to June 2026, prior approvals included. Appeals allowed is the share of planning and householder appeals decided since 1 September 2021 that were allowed in full or in part, shown where at least 10 were decided.
| Adur District Council | 8.8 years | None | 48% | 307 | 94% | 29% | |
| Amber Valley Borough Council | None on record | At examination | 29 July 2024 | 173% | 607 | 97% | 36% |
| Arun District Council | 8.2 years | None | 84% | 738 | 87% | 35% | |
| Ashfield District Council | Date not recorded | At examination | 29 April 2024 | 93% | 402 | 86% | 32% |
| Ashford Borough Council | 7.7 years | Getting started | 23 September 2026 | 75% | 942 | 88% | 24% |
| Babergh District Council | 2.9 years | Getting started | 147% | 803 | 88% | 29% | |
| Barnsley Metropolitan Borough Council | 7.8 years | None | 75% | 655 | 92% | 25% | |
| Basildon Borough Council | 28.8 years | Early consultation | 5 September 2023 | 23% | 824 | 89% | 38% |
| Basingstoke and Deane Borough Council | 10.4 years | Early consultation | 4 March 2024 | 94% | 1,037 | 91% | 32% |
| Bassetlaw District Council | 2.4 years | None | 357% | 564 | 80% | 28% | |
| Bath and North East Somerset Council | 12.3 years | Early consultation | 92% | 1,748 | 94% | 30% | |
| Bedford Borough Council | 6.8 years | Submitted | 12 January 2023 | 94% | 1,060 | 79% | 32% |
| Birmingham City Council | 9.8 years | Inspector's report | 1 September 2026 | 57% | 3,333 | 82% | 33% |
| Blaby District Council | 7.7 years | Early consultation | 1 March 2025 | 86% | 416 | 94% | 22% |
| Blackburn with Darwen Borough Council | 2.7 years | None | 381% | 478 | 97% | 20% | |
| Blackpool Borough Council | 10.7 years | Getting started | 156% | 314 | 84% | 31% | |
| Bolsover District Council | 4.6 years | None | 205% | 276 | 97% | 39% | |
| Bolton Metropolitan Borough Council | 2.6 years | Early consultation | 87% | 992 | 79% | 26% | |
| Borough Council of King's Lynn and West Norfolk | 1.6 years | None | 100% | 1,126 | 88% | 28% | |
| Boston Borough Council | 7.6 years | None | 127% | 302 | 91% | 14% | |
| Bournemouth, Christchurch and Poole Council | 2.2 years | None | 35% | 2,189 | 82% | 28% | |
| Bracknell Forest Council | 2.6 years | None | 104% | 474 | 92% | 32% | |
| Braintree District Council | 4.2 years | Early consultation | 150% | 911 | 84% | 29% | |
| Breckland District Council | 3.1 years | Early consultation | 1 June 2024 | 144% | 774 | 84% | 18% |
| Brentwood Borough Council | 4.6 years | None | 110% | 668 | 83% | 32% | |
| Brighton and Hove City Council | 10.6 years | Early consultation | 50% | 1,659 | 90% | 30% | |
| Bristol City Council | 15.3 years | Submitted | 25 April 2024 | 41% | 2,042 | 86% | 35% |
| Broadland District Council | 2.6 years | Getting started | 28 September 2026 | 111% | 719 | 92% | 17% |
| Broads Authority | 7.4 years | Proposed plan | 1 December 2025 | 127 | 97% | 30% | |
| Bromsgrove District Council | 9.7 years | Early consultation | 58% | 481 | 93% | 40% | |
| Broxbourne Borough Council | 6.3 years | None | 110% | 477 | 86% | 29% | |
| Broxtowe Borough Council | 7.2 years | Proposed plan | 109% | 477 | 94% | 52% | |
| Buckinghamshire Council | Former districts' plans | Early consultation | 94% | 4,532 | 85% | 33% | |
| Burnley Borough Council | 8.2 years | None | 478% | 295 | 87% | 33% | |
| Bury Metropolitan Borough Council | 2.6 years | Early consultation | 114% | 780 | 86% | 27% | |
| Calderdale Metropolitan Borough Council | 3.6 years | Early consultation | 1 April 2026 | 83% | 805 | 83% | 19% |
| Cambridge City Council | 8 years | Getting started | 82% | 986 | 91% | 28% | |
| Cannock Chase District Council | 12.4 years | At examination | 29 November 2024 | 115% | 251 | 89% | 20% |
| Canterbury City Council | 9.3 years | Early consultation | 1 June 2025 | 79% | 879 | 95% | 27% |
| Castle Point Borough Council | 27.9 years | Submitted | 31 January 2026 | 11% | 354 | 84% | 38% |
| Central Bedfordshire Council | 5.2 years | Early consultation | 17 August 2026 | 105% | 1,425 | 83% | 26% |
| Charnwood Borough Council | 0.7 years | None | 62% | 895 | 88% | 35% | |
| Chelmsford City Council | 6.4 years | Proposed plan | 4 February 2025 | 110% | 1,209 | 87% | 26% |
| Cheltenham Borough Council | 8.8 years | None | 56% | 906 | 97% | 27% | |
| Cherwell District Council | 11.2 years | Submitted | 31 July 2025 | 134% | 1,022 | 91% | 45% |
| Cheshire East Council | Date not recorded | Early consultation | 213% | 2,410 | 87% | 36% | |
| Cheshire West and Chester Council | Date not recorded | Early consultation | 16 October 2026 | 244% | 1,708 | 92% | 34% |
| Chesterfield Borough Council | 6.3 years | Early consultation | 168% | 357 | 87% | 29% | |
| Chichester District Council | Date not recorded | Proposed plan | 5 June 2026 | 124% | 866 | 88% | 36% |
| Chorley Borough Council | 14.2 years | Submitted | 30 June 2025 | 63% | 536 | 93% | 38% |
| City of Bradford Metropolitan District Council | 9.2 years | None | 56% | 2,354 | 87% | 25% | |
| City of Lincoln Council | 3.5 years | None | 141% | 324 | 92% | 28% | |
| City of London Corporation | 11.8 years | At examination | 29 August 2024 | 4% | 477 | 98% | 27% |
| City of Westminster | 5.5 years | Submitted | 28 November 2024 | 120% | 4,802 | 86% | 34% |
| City of Wolverhampton Council | 15.7 years | At examination | 16 December 2025 | 59% | 745 | 90% | 41% |
| City of York Council | 1.6 years | Getting started | 28 September 2026 | 87% | 1,198 | 83% | 29% |
| Colchester City Council | 5.7 years | Early consultation | 109% | 1,003 | 84% | 28% | |
| Cornwall Council | 9.9 years | Early consultation | 94% | 4,741 | 93% | 34% | |
| Cotswold District Council | 8.2 years | Early consultation | 2 January 2026 | 68% | 1,285 | 90% | 31% |
| Council of the Isles of Scilly | 5.6 years | Getting started | 23 September 2026 | 57 | 93% | ||
| Coventry City Council | 8.9 years | None | 47% | 1,055 | 82% | 35% | |
| Crawley Borough Council | 2 years | None | 36% | 217 | 83% | 31% | |
| Cumberland Council | Former districts' plans | Getting started | 14 September 2026 | 1,163 | 95% | 30% | |
| Dacorum Borough Council | 13.1 years | None | 52% | 1,123 | 87% | 30% | |
| Darlington Borough Council | 4.7 years | None | 285% | 458 | 91% | 22% | |
| Dartford Borough Council | 2.5 years | None | 96% | 596 | 77% | 28% | |
| Dartmoor National Park Authority | 4.9 years | Getting started | 23 August 2026 | 287 | 84% | 32% | |
| Derby City Council | 9.7 years | Getting started | 71% | 938 | 88% | 35% | |
| Derbyshire Dales District Council | 8.9 years | Early consultation | 90% | 486 | 86% | 36% | |
| Doncaster Metropolitan Borough Council | 5.1 years | None | 213% | 969 | 86% | 19% | |
| Dorset Council | 10.8 years | Early consultation | 13 October 2025 | 88% | 2,708 | 92% | 29% |
| Dover District Council | 2 years | None | 108% | 732 | 89% | 23% | |
| Dudley Metropolitan Borough Council | 15.7 years | Submitted | 14 February 2025 | 92% | 803 | 83% | 38% |
| Durham County Council | 6 years | None | 131% | 1,679 | 93% | 24% | |
| East Cambridgeshire District Council | 3 years | None | 116% | 692 | 89% | 35% | |
| East Devon District Council | 10.7 years | Proposed plan | 28 November 2025 | 84% | 1,267 | 88% | 33% |
| East Hampshire District Council | 12.4 years | Getting started | 1 July 2023 | 79% | 597 | 88% | 37% |
| East Hertfordshire District Council | 8 years | Getting started | 15 October 2026 | 102% | 1,111 | 83% | 35% |
| East Lindsey District Council | 8.2 years | None | 129% | 773 | 93% | 18% | |
| East Riding of Yorkshire Council | Date not recorded | Getting started | 31 August 2026 | 257% | 1,794 | 90% | 22% |
| East Staffordshire Borough Council | 11 years | None | 181% | 707 | 88% | 34% | |
| East Suffolk Council | 7.6 years | Getting started | 29 July 2026 | 91% | 1,897 | 92% | 27% |
| Eastbourne Borough Council | 13.7 years | Early consultation | 23% | 350 | 86% | 32% | |
| Eastleigh Borough Council | 4.5 years | None | 94% | 517 | 90% | 21% | |
| Ebbsfleet Development Corporation | None on record | Getting started | 26 | 96% | |||
| Elmbridge Borough Council | 15.2 years | Submitted | 10 August 2023 | 59% | 1,590 | 80% | 37% |
| Epping Forest District Council | 3.6 years | Early consultation | 66% | 1,282 | 68% | 36% | |
| Epsom and Ewell Borough Council | 19.2 years | At examination | 10 March 2025 | 33% | 591 | 82% | 29% |
| Erewash Borough Council | 12.6 years | At examination | 49% | 401 | 92% | 26% | |
| Exeter City Council | Date not recorded | Submitted | 26 September 2025 | 102% | 590 | 83% | 31% |
| Exmoor National Park Authority | 9.3 years | None | 180 | 96% | 44% | ||
| Fareham Borough Council | 3.5 years | Getting started | 2 October 2026 | 60% | 575 | 97% | 33% |
| Fenland District Council | 12.4 years | Submitted | 1 April 2023 | 117% | 588 | 86% | 38% |
| Folkestone and Hythe Council | 4.6 years | Inspector's report | 23 February 2026 | 57% | 697 | 82% | 28% |
| Forest of Dean District Council | 14.6 years | Early consultation | 1 October 2025 | 128% | 526 | 93% | 29% |
| Fylde Borough Council | 4.9 years | None | 175% | 413 | 96% | 34% | |
| Gateshead Metropolitan Borough Council | 11.6 years | Getting started | 29 July 2026 | 105% | 510 | 87% | 32% |
| Gedling Borough Council | 12.1 years | None | 125% | 376 | 93% | 32% | |
| Gloucester City Council | 3.8 years | None | 63% | 436 | 80% | 28% | |
| Gosport Borough Council | 11 years | Getting started | 25% | 247 | 95% | 35% | |
| Gravesham Borough Council | 12 years | None | 61% | 632 | 75% | 28% | |
| Great Yarmouth Borough Council | 10.8 years | Submitted | 24 February 2025 | 92% | 333 | 83% | 26% |
| Guildford Borough Council | Date not recorded | None | 102% | 1,362 | 85% | 34% | |
| Halton Borough Council | 4.6 years | None | 170% | 219 | 96% | 38% | |
| Harborough District Council | 7.5 years | Proposed plan | 10 March 2025 | 139% | 774 | 89% | 32% |
| Harlow District Council | 5.9 years | None | 91% | 287 | 83% | 40% | |
| Hart District Council | 6.5 years | Early consultation | 23 September 2026 | 137% | 715 | 85% | 39% |
| Hartlepool Borough Council | 8.4 years | None | 339% | 215 | 94% | 27% | |
| Hartlepool Development Corporation | None on record | None | 36 | 89% | |||
| Hastings Borough Council | 12.7 years | Getting started | 44% | 329 | 87% | 40% | |
| Havant Borough Council | 15.6 years | Early consultation | 80% | 407 | 94% | 22% | |
| Herefordshire Council | 11 years | None | 96% | 1,484 | 94% | 30% | |
| Hertsmere Borough Council | 13.7 years | Early consultation | 26% | 738 | 89% | 46% | |
| High Peak Borough Council | 10.5 years | Getting started | 121% | 340 | 83% | 40% | |
| Hinckley and Bosworth Borough Council | 16.8 years | Proposed plan | 134% | 545 | 89% | 31% | |
| Horsham District Council | 10.9 years | At examination | 26 July 2024 | 44% | 1,339 | 91% | 24% |
| Hull City Council | 8.9 years | None | 107% | 449 | 90% | 30% | |
| Huntingdonshire District Council | 7.4 years | Early consultation | 136% | 1,058 | 87% | 29% | |
| Hyndburn Borough Council | 14.7 years | None | 411% | 266 | 78% | 51% | |
| Ipswich Borough Council | Date not recorded | Getting started | 1 October 2026 | 63% | 430 | 93% | 36% |
| Isle of Wight Council | 14.6 years | At examination | 37% | 729 | 92% | 39% | |
| Kirklees Council | 7.6 years | Early consultation | 65% | 1,766 | 90% | 25% | |
| Knowsley Metropolitan Borough Council | 10.8 years | None | 245% | 274 | 96% | 17% | |
| Lake District National Park Authority | 5.4 years | Getting started | 9 September 2026 | 722 | 89% | 23% | |
| Lancaster City Council | 6.2 years | Getting started | 7 October 2026 | 48% | 654 | 83% | 26% |
| Leeds City Council | 7.1 years | Early consultation | 115% | 3,465 | 82% | 28% | |
| Leicester City Council | 12.3 years | Submitted | 26 September 2023 | 39% | 997 | 82% | 29% |
| Lewes District Council | 10.4 years | None | 60% | 405 | 89% | 36% | |
| Lichfield District Council | 11.7 years | Early consultation | 232% | 677 | 84% | 27% | |
| Liverpool City Council | 4.7 years | None | 87% | 1,612 | 85% | 42% | |
| London Borough of Barking and Dagenham | 2.1 years | Proposed plan | 58% | 681 | 65% | 25% | |
| London Borough of Barnet | 1.6 years | None | 97% | 2,417 | 74% | 36% | |
| London Borough of Bexley | 3.5 years | None | 85% | 1,258 | 90% | 29% | |
| London Borough of Brent | 4.6 years | Getting started | 30 September 2026 | 56% | 1,916 | 77% | 31% |
| London Borough of Bromley | 7.8 years | None | 62% | 2,314 | 76% | 33% | |
| London Borough of Camden | 9.3 years | Submitted | 3 October 2025 | 63% | 1,951 | 89% | 29% |
| London Borough of Croydon | 8.6 years | None | 105% | 1,576 | 73% | 24% | |
| London Borough of Ealing | 14.5 years | Submitted | 18 November 2024 | 60% | 1,955 | 83% | 30% |
| London Borough of Enfield | 15.9 years | At examination | 77% | 1,919 | 79% | 32% | |
| London Borough of Hackney | 6.2 years | None | 52% | 1,287 | 82% | 43% | |
| London Borough of Hammersmith & Fulham | 8.6 years | Early consultation | 91% | 1,227 | 95% | 42% | |
| London Borough of Haringey | 9.2 years | Early consultation | 71% | 1,464 | 85% | 28% | |
| London Borough of Harrow | 14.7 years | None | 106% | 1,362 | 75% | 34% | |
| London Borough of Havering | 4.9 years | Getting started | 40% | 1,446 | 77% | 32% | |
| London Borough of Hillingdon | 13.9 years | None | 67% | 1,633 | 85% | 35% | |
| London Borough of Hounslow | Date not recorded | Submitted | 23 June 2025 | 76% | 1,216 | 75% | 41% |
| London Borough of Islington | 3.1 years | None | 69% | 1,426 | 88% | 29% | |
| London Borough of Lambeth | 5.1 years | Getting started | 10 September 2026 | 39% | 1,793 | 79% | 31% |
| London Borough of Lewisham | 1.3 years | None | 65% | 1,256 | 84% | 27% | |
| London Borough of Merton | 1.9 years | None | 63% | 1,073 | 91% | 29% | |
| London Borough of Newham | 7.9 years | At examination | 2 December 2025 | 61% | 978 | 83% | 23% |
| London Borough of Redbridge | 8.6 years | None | 30% | 1,638 | 73% | 29% | |
| London Borough of Richmond upon Thames | 1 years | None | 63% | 1,825 | 82% | 38% | |
| London Borough of Southwark | Date not recorded | None | 69% | 1,492 | 91% | 22% | |
| London Borough of Sutton | 8.6 years | Early consultation | 81% | 879 | 88% | 33% | |
| London Borough of Tower Hamlets | 6.8 years | Proposed plan | 47% | 972 | 84% | 25% | |
| London Borough of Waltham Forest | 2.6 years | None | 84% | 1,406 | 79% | 27% | |
| London Borough of Wandsworth | 3.2 years | At examination | 123% | 2,123 | 89% | 28% | |
| Luton Borough Council | 8.9 years | None | 54% | 731 | 75% | 31% | |
| Maidstone Borough Council | 2.6 years | Getting started | 93% | 1,097 | 84% | 35% | |
| Maldon District Council | 9.2 years | None | 143% | 478 | 84% | 41% | |
| Malvern Hills District Council | 10.6 years | Getting started | 18 September 2026 | 101% | 737 | 82% | 38% |
| Manchester City Council | 2.6 years | Early consultation | 75% | 1,807 | 89% | 39% | |
| Mansfield District Council | 6.1 years | None | 134% | 284 | 96% | 23% | |
| Medway Council | Date not recorded | Submitted | 18 December 2025 | 60% | 918 | 92% | 32% |
| Melton Borough Council | 8 years | None | 190% | 333 | 88% | 45% | |
| Mid Devon District Council | 6.2 years | Getting started | 10 July 2026 | 103% | 663 | 95% | 36% |
| Mid Suffolk District Council | 2.9 years | Getting started | 227% | 849 | 90% | 22% | |
| Mid Sussex District Council | 8.6 years | Submitted | 8 July 2024 | 104% | 1,089 | 91% | 28% |
| Middlesbrough Borough Council | 11.9 years | Submitted | 174% | 301 | 74% | 32% | |
| Middlesbrough Development Corporation | None on record | None | 69 | 88% | |||
| Milton Keynes City Council | 7.6 years | Proposed plan | 7 November 2025 | 142% | 1,030 | 88% | 25% |
| Mole Valley District Council | 2 years | None | 72% | 857 | 73% | 30% | |
| New Forest District Council | 6.3 years | None | 48% | 884 | 90% | 20% | |
| New Forest National Park Authority | 7.1 years | None | 471 | 88% | 47% | ||
| Newark and Sherwood District Council | 7.6 years | None | 139% | 752 | 91% | 31% | |
| Newcastle City Council | 11.6 years | Getting started | 29 July 2026 | 87% | 1,018 | 89% | 24% |
| Newcastle-under-Lyme Borough Council | 17 years | At examination | 94% | 441 | 91% | 44% | |
| North Devon District Council | 8 years | Getting started | 11 August 2026 | 122% | 874 | 94% | 26% |
| North East Derbyshire District Council | 4.9 years | Early consultation | 268% | 503 | 91% | 27% | |
| North East Lincolnshire Council | 8.6 years | Early consultation | 244% | 447 | 94% | 37% | |
| North Hertfordshire District Council | 3.9 years | Early consultation | 13 October 2026 | 75% | 995 | 91% | 33% |
| North Kesteven District Council | 3.5 years | None | 141% | 616 | 97% | 14% | |
| North Lincolnshire Council | 15.3 years | None | 137% | 681 | 89% | 35% | |
| North Norfolk District Council | 0.8 years | None | 54% | 871 | 93% | 20% | |
| North Northamptonshire Council | Former districts' plans | Getting started | 14 October 2026 | 108% | 1,111 | 90% | 38% |
| North Somerset Council | 9.8 years | Proposed plan | 64% | 1,087 | 90% | 26% | |
| North Tyneside Council | 9.2 years | None | 65% | 612 | 97% | 29% | |
| North Warwickshire Borough Council | 5 years | None | 164% | 340 | 95% | 32% | |
| North West Leicestershire District Council | 8.9 years | Getting started | 184% | 532 | 95% | 36% | |
| North York Moors National Park Authority | 6.2 years | Getting started | 30 September 2026 | 418 | 96% | 33% | |
| North Yorkshire Council | Former districts' plans | Early consultation | 218% | 4,642 | 89% | 34% | |
| Northumberland County Council | 4.5 years | Getting started | 9 September 2026 | 262% | 2,028 | 89% | 27% |
| Northumberland National Park Authority | 6.3 years | None | 36 | 92% | |||
| Norwich City Council | 2.6 years | Getting started | 28 September 2026 | 111% | 558 | 95% | 22% |
| Nottingham City Council | 12.1 years | Proposed plan | 108% | 922 | 88% | 37% | |
| Nuneaton and Bedworth Borough Council | None on record | At examination | 221% | 284 | 94% | 41% | |
| Oadby and Wigston Borough Council | 7.5 years | Proposed plan | 1 July 2025 | 152% | 248 | 73% | 21% |
| Old Oak and Park Royal Development Corporation | 4.3 years | None | 58% | 59 | 83% | ||
| Oldham Metropolitan Borough Council | 2.6 years | Getting started | 115% | 814 | 93% | 26% | |
| Oxford City Council | 6.4 years | Early consultation | 1 December 2025 | 65% | 1,186 | 88% | 32% |
| Peak District National Park Authority | 7.4 years | None | 513 | 87% | 34% | ||
| Pendle Borough Council | 0.8 years | Getting started | 135% | 440 | 84% | 35% | |
| Peterborough City Council | 7.2 years | Early consultation | 100% | 626 | 85% | 22% | |
| Plymouth City Council | 7.6 years | Getting started | 87% | 672 | 95% | 19% | |
| Portsmouth City Council | 14.7 years | None | 11% | 650 | 86% | 43% | |
| Preston City Council | Date not recorded | Getting started | 460% | 612 | 91% | 14% | |
| Reading Borough Council | 7 years | None | 136% | 652 | 85% | 30% | |
| Redcar and Cleveland Borough Council | 8.4 years | None | 841% | 387 | 95% | 34% | |
| Redditch Borough Council | Date not recorded | Getting started | 14 August 2026 | 129% | 171 | 95% | 41% |
| Reigate and Banstead Borough Council | 7.1 years | Getting started | 14 September 2026 | 102% | 936 | 89% | 34% |
| Ribble Valley Borough Council | 11.8 years | Early consultation | 1 November 2025 | 425% | 487 | 82% | 31% |
| Rochdale Metropolitan Borough Council | 2.6 years | None | 125% | 607 | 86% | 32% | |
| Rochford District Council | 14.8 years | Getting started | 111% | 471 | 80% | 42% | |
| Rossendale Borough Council | 4.8 years | Getting started | 30 September 2026 | 96% | 242 | 86% | 33% |
| Rother District Council | 12 years | Early consultation | 35% | 714 | 89% | 25% | |
| Rotherham Metropolitan Borough Council | 12.1 years | None | 139% | 731 | 78% | 28% | |
| Royal Borough of Greenwich | 12.2 years | None | 42% | 1,389 | 77% | 38% | |
| Royal Borough of Kensington and Chelsea | 2.2 years | None | 78% | 2,292 | 93% | 43% | |
| Royal Borough of Kingston upon Thames | 14.5 years | Early consultation | 1 February 2025 | 66% | 1,100 | 78% | 38% |
| Royal Borough of Windsor and Maidenhead | 4.7 years | None | 74% | 1,409 | 73% | 28% | |
| Rugby Borough Council | 7.4 years | Early consultation | 187% | 443 | 93% | 34% | |
| Runnymede Borough Council | Date not recorded | None | 94% | 600 | 84% | 20% | |
| Rushcliffe Borough Council | Date not recorded | Proposed plan | 172% | 760 | 92% | 33% | |
| Rushmoor Borough Council | 7.7 years | Getting started | 21 September 2026 | 176% | 276 | 95% | 21% |
| Rutland County Council | Date not recorded | Submitted | 89% | 510 | 88% | 33% | |
| Salford City Council | 2.6 years | Early consultation | 178% | 708 | 87% | 24% | |
| Sandwell Metropolitan Borough Council | 13.9 years | At examination | 30 March 2026 | 34% | 856 | 87% | 36% |
| Sefton Metropolitan Borough Council | 9.5 years | At examination | 135% | 1,033 | 93% | 38% | |
| Sevenoaks District Council | 15.6 years | None | 25% | 1,099 | 87% | 30% | |
| Sheffield City Council | 17.6 years | At examination | 58% | 1,716 | 87% | 33% | |
| Shropshire Council | Date not recorded | None | 124% | 2,076 | 87% | 30% | |
| Slough Borough Council | 17.8 years | Early consultation | 54% | 616 | 80% | 35% | |
| Solihull Metropolitan Borough Council | 12.9 years | None | 53% | 1,100 | 94% | 40% | |
| Somerset Council | Former districts' plans | Early consultation | 9 August 2026 | 3,544 | 87% | 34% | |
| South Cambridgeshire District Council | 8.1 years | Early consultation | 148% | 1,498 | 94% | 36% | |
| South Derbyshire District Council | 10.3 years | Getting started | 195% | 596 | 93% | 43% | |
| South Downs National Park Authority | 7.3 years | Early consultation | 1,616 | 91% | 30% | ||
| South Gloucestershire Council | 12.8 years | Proposed plan | 138% | 1,490 | 88% | 41% | |
| South Hams District Council | 7.6 years | None | 87% | 976 | 92% | 37% | |
| South Holland District Council | 7.6 years | None | 161% | 574 | 79% | 30% | |
| South Kesteven District Council | 6.7 years | Early consultation | 97% | 961 | 90% | 36% | |
| South Norfolk District Council | 2.6 years | Getting started | 28 September 2026 | 111% | 1,003 | 92% | 29% |
| South Oxfordshire District Council | 5.9 years | At examination | 3 June 2025 | 171% | 1,465 | 94% | 40% |
| South Ribble Borough Council | Date not recorded | Submitted | 334% | 392 | 97% | 21% | |
| South Staffordshire Council | Date not recorded | Submitted | 171% | 610 | 83% | 33% | |
| South Tyneside Council | 19.3 years | At examination | 53% | 387 | 90% | 36% | |
| Southampton City Council | Date not recorded | Getting started | 11 October 2026 | 30% | 685 | 90% | 29% |
| Southend-on-Sea Borough Council | 18.8 years | None | 20% | 866 | 82% | 34% | |
| Spelthorne Borough Council | 17.6 years | At examination | 25 November 2022 | 33% | 566 | 79% | 31% |
| St Albans City and District Council | Date not recorded | At examination | 29 November 2024 | 46% | 1,415 | 86% | 33% |
| St Helens Council | Date not recorded | None | 118% | 455 | 94% | 25% | |
| Stafford Borough Council | 12.3 years | Getting started | 6 August 2026 | 149% | 508 | 81% | 43% |
| Staffordshire Moorlands District Council | 6.1 years | Early consultation | 1 October 2025 | 160% | 381 | 76% | 37% |
| Stevenage Borough Council | 7.4 years | Submitted | 78% | 246 | 96% | 56% | |
| Stockport Metropolitan Borough Council | 15.6 years | Early consultation | 43% | 1,289 | 95% | 31% | |
| Stockton-on-Tees Borough Council | 7.7 years | None | 152% | 615 | 92% | 31% | |
| Stoke-on-Trent City Council | 17 years | Getting started | 66% | 551 | 87% | 35% | |
| Stratford-on-Avon District Council | 10.3 years | Early consultation | 7 March 2025 | 202% | 1,228 | 92% | 36% |
| Stroud District Council | 10.9 years | Submitted | 25 October 2021 | 85% | 917 | 88% | 35% |
| Sunderland City Council | 6.7 years | Getting started | 29 September 2026 | 167% | 607 | 91% | 30% |
| Surrey Heath Borough Council | 14.7 years | At examination | 10 December 2024 | 98% | 589 | 86% | 35% |
| Swale Borough Council | 9.2 years | Getting started | 70% | 644 | 89% | 32% | |
| Swindon Borough Council | 11.6 years | Early consultation | 87% | 829 | 90% | 33% | |
| Tameside Metropolitan Borough Council | 2.6 years | None | 232% | 553 | 86% | 26% | |
| Tamworth Borough Council | 10.6 years | Getting started | 220% | 152 | 95% | 24% | |
| Tandridge District Council | 18 years | None | 38% | 712 | 82% | 38% | |
| Teignbridge District Council | 12.4 years | None | 78% | 718 | 80% | 32% | |
| Telford & Wrekin Council | 8.8 years | None | 309% | 559 | 91% | 40% | |
| Tendring District Council | 5.7 years | None | 152% | 848 | 84% | 28% | |
| Test Valley Borough Council | 10.7 years | None | 64% | 993 | 93% | 30% | |
| Tewkesbury Borough Council | 8.8 years | Early consultation | 219% | 692 | 88% | 33% | |
| Thanet District Council | 6.3 years | None | 70% | 684 | 92% | 24% | |
| Three Rivers District Council | 15 years | Early consultation | 1 December 2024 | 47% | 809 | 89% | 37% |
| Thurrock Council | 11.7 years | Early consultation | 1 March 2025 | 29% | 670 | 81% | 31% |
| Tonbridge and Malling Borough Council | 19.1 years | Early consultation | 63% | 891 | 95% | 41% | |
| Torbay Council | 10.9 years | None | 40% | 504 | 87% | 35% | |
| Torridge District Council | 8 years | Getting started | 11 August 2026 | 122% | 512 | 90% | 29% |
| Trafford Metropolitan Borough Council | 2.6 years | Early consultation | 83% | 1,352 | 86% | 28% | |
| Tunbridge Wells Borough Council | 0.9 years | Getting started | 93% | 1,100 | 93% | 30% | |
| Uttlesford District Council | Date not recorded | Inspector's report | 16 January 2026 | 108% | 1,215 | 76% | 31% |
| Vale of White Horse District Council | 9.8 years | Submitted | 192% | 981 | 95% | 32% | |
| Wakefield Metropolitan District Council | 2.7 years | None | 112% | 1,084 | 92% | 32% | |
| Walsall Metropolitan Borough Council | 15.7 years | Early consultation | 56% | 753 | 84% | 34% | |
| Warrington Borough Council | 2.9 years | None | 134% | 843 | 79% | 36% | |
| Warwick District Council | 9.1 years | None | 128% | 864 | 91% | 39% | |
| Watford Borough Council | 4 years | None | 95% | 496 | 80% | 34% | |
| Waverley Borough Council | 8.7 years | Early consultation | 117% | 1,362 | 88% | 34% | |
| Wealden District Council | 13.7 years | Early consultation | 89% | 1,283 | 85% | 31% | |
| Welwyn Hatfield Borough Council | 3 years | None | 46% | 632 | 85% | 31% | |
| West Berkshire Council | 1.4 years | None | 114% | 1,037 | 90% | 38% | |
| West Devon Borough Council | 7.6 years | None | 87% | 346 | 87% | 32% | |
| West Lancashire Borough Council | 13 years | Early consultation | 279% | 543 | 81% | 34% | |
| West Lindsey District Council | 3.5 years | None | 141% | 556 | 93% | 21% | |
| West Northamptonshire Council | Former districts' plans | Early consultation | 1 March 2025 | 104% | 1,852 | 88% | 32% |
| West Oxfordshire District Council | 8.1 years | Early consultation | 104% | 1,117 | 95% | 28% | |
| West Suffolk Council | None on record | Getting started | 28 July 2026 | 89% | 1,000 | 93% | 28% |
| Westmorland and Furness Council | Former districts' plans | Early consultation | 11 August 2026 | 307% | 1,131 | 93% | 32% |
| Wigan Metropolitan Borough Council | 2.6 years | None | 153% | 690 | 85% | 24% | |
| Wiltshire Council | 11.7 years | None | 93% | 3,509 | 93% | 36% | |
| Winchester City Council | 13.6 years | At examination | 15 November 2024 | 174% | 854 | 93% | 24% |
| Wirral Borough Council | 1.5 years | None | 123% | 877 | 88% | 27% | |
| Woking Borough Council | 14 years | Early consultation | 97% | 694 | 84% | 34% | |
| Wokingham Borough Council | Date not recorded | At examination | 28 February 2025 | 100% | 1,117 | 95% | 31% |
| Worcester City Council | 10.6 years | Getting started | 18 September 2026 | 88% | 386 | 89% | 36% |
| Worthing Borough Council | 3.6 years | None | 142% | 553 | 90% | 29% | |
| Wychavon District Council | 10.6 years | Getting started | 18 September 2026 | 103% | 1,057 | 84% | 43% |
| Wyre Borough Council | 3.7 years | Early consultation | 237% | 529 | 85% | 27% | |
| Wyre Forest District Council | 4.5 years | None | 212% | 434 | 92% | 41% | |
| Yorkshire Dales National Park Authority | 9.8 years | None | 434 | 91% | 20% |